Agreement Between Owner And Electrical Contractor

By محمد راستگو,

  Filed under: دسته‌بندی نشده
  Comments: None

a) All materials and treatments must be the best of each type and be described in calendars. The architect`s decision regarding the sets, quantities and scope of the material and treatment is final and binding for the contractor. Specific marks indicated according to the attached schedule. An employment contract for the construction of the house in India between the owner and the contractor must be concluded to mention all civil engineering work included in the contractual agreement and excluded. The following services are provided as part of this electrical services agreement The agreement should mention the cost of different building materials used for the construction of the house. If we are not talking about additional fees, they should be discussed with the housing contractor. If you go for a package for specific extra work that is performed differently than mentioned in the agreement. You should receive a quote if you have to pay additional expenses. Before handing over the building to the owner, the maintenance time must be specified in the contract.

In most cases, the maintenance period is from six months to one year. If the contractor is late, the defects must be corrected and corrected within the time indicated by the architect/owner. The owner should be able to monitor the work done by the owner and require modifications based on his needs. The contractor is required to supply the goods and products in accordance with the contract. There should be communication between the owner and the contractor so that the project is carried out without any problems. 3. The term architect is architect – (architect`s name and company information) with office address at #____ – (address of the architectural office) and their representatives appointed by the owner and, if hired, be the architect designated by the owner and the other in writing. Many people regret the importance of a well-documented agreement between the owner and the contractor, which is beneficial to both the parties, including the owner and the developer. Below we discussed the points that we should consider in the mutual agreement. 7.

The tax on construction contracts, if any, is included in the rates indicated in Part 2 (quantity accounting) of this agreement.

Comments are closed for this post.